What are the Stages of a Construction Project?

All construction projects are unique. Each progresses from start to finish in a one-of-a-kind way. That said, there are 5 stages of construction that apply to every project, whether it’s a single family home or 50-story condo development. If you’re involved in construction, knowing these stages can help you see the big picture, yet also understand how a project evolves from someone’s vision to the Certificate of Occupancy.

Design

This stage begins well before the various disciplines get to work at their drawing tables. It starts with the client who must determine what they can afford and understand their needs. The client should establish an unswerving budget, and work on a list of functions and features that their building must have. These can include floor areas, aesthetics, energy efficiency goals, community impact, and everything in between. Ascertaining these variables before the architect gets to work can reduce the number of design revisions and make the design phase smoother.

With a firm budget and a detailed list of design intentions, the client takes their project to the architect who will consider all these factors and issue a fee proposal. Next, the architect will work out a conceptual design based on the client’s earlier inputs and allow the client to review it and provide feedback. As the design evolves, the client will continue to collaborate with the architect to ensure that their vision is making its way onto paper.

When the architectural drawings start to take shape, it’s a good idea to engage a civil or structural engineer. These professionals will help assess the site, draft grading plans and earthquake estimates, and design the building’s structure to fit the architectural design. At this stage, the engineer may begin to coordinate the structural design with the architect, to make sure that the disciplines interface seamlessly.


The architect will base the building’s energy model on the Building Energy Efficiency Standards, the California Green Building Standards Code, and the client’s preference, should it surpass these mandatory regulations. The building’s energy performance will be greatly affected by the architectural features and the systems that will operate inside it. These considerations will play a role in steering the project’s architectural, mechanical, and electrical designs.

At this stage, other disciplines will join the collaboration too – mechanical, electrical, and plumbing (MEP) engineers will have to coordinate the layouts of their services with the architect and structural engineer. Together, the design team will work on finalizing a bid set – a package of drawings used to solicit bids from general contractors (GCs).

Pre-construction

The pre-construction phase begins once the bidding process is complete and the contract is awarded to a GC. Now, the project team will be assembled and tasked with preparing the site for construction. Typically, project teams include the following individuals:

  • project manager
  • superintendent
  • field engineer
  • contract administrator
  • health and safety supervisor

During the pre-construction stage, the project team will apply for permits and approval, and coordinate the tasks involved in securing these documents. At times, approval can crisscross from one committee to another, until all relevant parties are satisfied. Permits can also undergo several revision cycles, during which the design team will have to make changes ordered by building officials. The approved version of the drawings will then be issued for construction.

At this time, the GC will finalize a construction schedule that incorporates any last-minute design and/or time changes that arise during permitting. The GC will also coordinate submittal procedures with the rest of the project team and establish the following:

  • items that require submittals
  • deadlines for submittal delivery
  • method of submittal transmission
  • submittal review process
  • deadlines for review
  • communications and document control

After the permits and approval are given, the site is prepared, and the construction drawings are issued, the project can move onto the procurement stage.

Procurement 

At this stage of the project, the GC will award contracts to their subcontractors. The process may begin with a new quantity takeoff based on the construction drawings. With the new quantities established, the GC and their subcontractors will obtain materials, labor, and equipment for their respective scopes of work. This breakdown differs between projects, as some GCs may self-perform some parts of the project while leaving the more specialized scopes to their subcontractors.

The procurement stage presents an opportunity to find savings in the project. Contractors who have a robust network of suppliers, or are working on several projects at the same time, may save thanks to their relationships and economies of scale. Depending on the type of contract, the client may or may not reap the benefits of these savings.

Construction 

Before shovels hit the dirt, it’s essential to hold a pre-construction meeting. The GC’s project manager, superintendent, and field engineers, representatives of the architect and engineer, owner or the owner’s representative, as well as certain major subcontractors should be in attendance. On occasion, an official from the local jurisdiction may have to attend too. The meeting should address at least the following topics:

  • site access
  • logistics and storage
  • quality control
  • outstanding contract details
  • outstanding design-related challenges
  • health and safety

With the meeting adjourned, the project can get underway.

During construction, members of the project team continue to serve their respective functions. The GC retains control over the process, manages resources, and monitors, documents, and communicates the progress of the project. The design team will monitor the work for conformance with approved plans, review change orders, substitution requests, submittals, and respond to Requests for Information (RFIs).

Closeout and owner occupancy

When the final construction activity is complete, the project moves to its final phase – closeout, followed by owner occupancy.

Closing out a construction project consists of several tasks. The building must be inspected by the building officials. The client or the client’s representative must also verify that the work conforms to the approved drawings and specifications. Any deficiencies must be identified and remedied, systems must be tested, and in the end, the architect will certify the final payment.

Next, the GC will show the owner how the building and its systems operate. On complex projects such as hospitals, the task of training the client’s staff may take a while. Finally, the GC will hand over the building to the owner and their responsibility for the project will come to an end.

How Design Everest Can Help

Whether you’re a homeowner, contractor, developer, or a design professional, Design Everest can help your project with a full suite of civil and structural engineering services. Call us at (877) 704-5727 to discuss your project and receive a quote today.

Before you begin constructing your home, there are many elements that need to be considered in order to ensure the project runs smoothly and meets its
It is almost a life-long dream for most to own their own house and adorn it with their personal touch to call it home. While the rosy picture is nice
What are beams and columns in construction and why are they important?   Beams and columns have been a staple in architecture since Ancient Egypt
Determining what part of the construction cost is due to the architectural aspects and which is due to the engineering elements such as the structural

KEEP UP TO DATE WITH ALL THINGS DESIGN EVEREST

Email Subscription

Opt In
Hidden
Hidden
Hidden
This field is for validation purposes and should be left unchanged.

Get a Quote (Simplified)

"*" indicates required fields

Opt In
Hidden
Hidden
Hidden
This field is for validation purposes and should be left unchanged.